Waste collection process is an integrated part of the waste treatment plan. It is directly related to the smooth operation of the waste treatment facility. Optimizing the waste collection plan has a large effect on both the collection process and the operation of the treatment facility. For every municipality that collaborates with HJM group, we can either take over the collection process at very competitive price, or provide consulting services to optimise the current collection process.
The services we provide for the collection process include:
- Analyse current disposal scheme
- Identify and capture opportunities to improve deficiencies
- Reduce the time of the collection
- Reduce fuel consumption
- Maximize turnover of waste treated per collection are
- Minimize the residence time of waste before collection
- Minimize the amount of labour needed for the collection process
- Maximize recyclables value with experienced handling of waste
- Tailor-made waste and recycling collection service for a wide range of liquid and solid waste streams
- Minimize damage to waste to maximize recovery
- Road cleaning
The logistics can also affect the waste treatment facility operation, including:
- Sustainable plant operation
- Optimizing number of labours in a plant
- Reducing the residence time of disposed waste in the plant prior to treatment
- Reducing hazardous odour